General Electric Haliade-X

wind turbine maintenance, blade maintenance services, turbine maintenance

General Electric invested 400 million dollars to create the Haliade-X. It is the largest wind turbine to ever be manufactured, sitting 260 metres above sea level. The Haliade-X in the 12MW variant, has a 63% capacity factor above industry standard. It is as tall as an 85-story building and each blade is 107m long.  The […]